Wollongong

About Project

A 4 story block of apartments with a failed roof waterproofing membrane.

  • Remove existing bituminous membrane back to slab
  • Make good to slab and verify drainage
  • Install new liquid membrane to manufacturers specification
  • A requirement was to section roof to owners strata entitlements
  • Supply and install new aluminum balustrades as per above requirements.