Remove the Lot 1 & 2 North terrace balcony tiling, screed, old membranes and grind back to bare concrete
Stabilise, repair and seal any concrete cracks and concrete spalling before preparing and waterproofing the terrace balcony and service penetrations with a waterproofing system that incorporates a membrane top and bottom of the screed followed by re-tiling
Seal and waterproof the the balustrade supporting track and perimeter hob
Remove all of the garage structure external render (including walls, perimeter hob and mouldings), stabilise, repair and seal any substrate cracks, treat the substrate with a salt neutralising agent and apply new acrylic render with incorporation of sealed render movement control joints
Prepare and paint the new render with a waterproofing protective painted coating which is resistant to an exposed coastal environment
Prepare and seal the interface of the East and West stairs to the garage structure wall interfaces with an external grade elastomeric sealant
Internal Garage Structures
Stabilise, repair and seal any brick masonry and concrete cracks and/or concrete spalling
Prepare and negative waterproof the garage structure, east, south and west inside walls (which are retaining earth under the stairs and building) with a polymer modified cementitious water cure membrane inclusive of interface seals
Prepare and paint the internal walls and ceiling with protective painted coating which is resistant to an exposed coastal environment